| Active Bioretention Cell |
| Active Contructed Wetland |
| Active Detention Basin |
| Active Infiltration Basin |
| Active Infiltration Trench |
| Active Manufactured System |
| Active No Value |
| Active Other |
| Active Retention Basin |
| Active Stream Grade Control |
| Active Underground Detention |
| Proposed Bioretention Cell |
| Proposed Contructed Wetland |
| Proposed Detention Basin |
| Proposed Infiltration Basin |
| Proposed Infiltration Trench |
| Proposed Manufactured System |
| Proposed No Value |
| Proposed Other |
| Proposed Retention Basin |
| Proposed Stream Grade Control |
| Proposed Underground Detention |
| Retired |